City building department · Idaho
Twin Falls building department
Permits, inspections, and official contacts for City of Twin Falls Building Safety Department.
Verified Checked against 11 official sources
Contacts & online services
- Phone
- (208) 735-7238
- Office
- 203 Main Avenue East, Twin Falls, ID 83301
Get directions (opens in a new tab) - Serves
- Twin Falls · Twin Falls County
- Online services
- Applications · Permit search · Inspections
Check your address first. City of Twin Falls Building Safety Department handles building permits for property inside Twin Falls city limits. Property outside city limits is usually served by Twin Falls County or another municipality, even when the mailing address says Twin Falls.
On this page
The City of Twin Falls Building Safety Department reviews plans, issues building and trade permits, inspects new and existing structures, and issues certificates of occupancy inside city limits. Its office is at 203 Main Avenue East (mailing address P.O. Box 1907). The department works with Planning & Zoning, Fire and Engineering on plan approvals and change orders.
When a permit is required
The City’s Permit Requirements page lists:
- additions of any kind, such as sunrooms, garages and pools
- all electrical, plumbing, mechanical and gas work
- every new single-family home
- residential detached accessory buildings over 200 sq ft, and commercial accessory buildings over 120 sq ft
- fences over 7 feet tall
- most alterations, including new built-up roofs or trusses and new windows
- new commercial buildings, remodels and additions
- signs, including temporary event banners
- starting a home-based business
Twin Falls lists interior painting, reroofing and carpet replacement as work that doesn’t need a permit. For everything else, the City follows the exemption lists in Section 105.2 of the 2018 IRC (residential) and 2018 IBC (commercial). Properties in the historic preservation district must go before the Historic Preservation Commission before a permit is issued. Arrange that through Planning & Zoning, 208-735-7267.
Applying
Residential building permits can be filed online. The City’s newer ArcGIS-based Building Permit Portal and the Cityworks portal both accept applications, and Cityworks also handles mechanical, electrical and plumbing permits. The Applications & Forms page has PDF applications for:
- new homes
- enclosed and non-enclosed additions
- detached accessories (shed, garage, deck, pool)
- interior remodels
- demolition, moving a building, temporary structures and manufactured or modular homes
- an ag-exempt permit
- a 2026 repair permit guide
Commercial projects follow the Commercial Development Guide (August 18, 2025) and the City’s electronic plan submission standards.
Since October 1, 2024, plan review fees for commercial, industrial and multifamily projects are due when you apply, and review doesn’t start until they’re paid. That rule doesn’t yet apply to single-family and duplex projects. Commercial submittals are reviewed by four departments, and revisions aren’t accepted until all four first reviews are done.
Published plan review timelines (to first review)
| Project | Time |
|---|---|
| New single-family home | 2 weeks |
| Residential fence, deck or pool | 2 weeks |
| Commercial new building, addition, tenant improvement or multifamily | 5 weeks |
| Commercial miscellaneous (signs, pools, fences) | 3 weeks |
| Mechanical plan review | 3 weeks |
Incomplete submittals don’t enter the review queue.
Fees
Building permit fees follow the City’s 2024 Building Permit Fee Schedule and the Master City-Wide Fee Schedule. Impact fees (effective January 1, 2025), sewer connection and water connection fees are published separately. According to the fee schedule footnotes:
- Applicants declare the project value. For one- and two-family homes, the declared value must be within 20% of the average per-square-foot value of homes permitted in Twin Falls the prior fiscal year.
- New-home mechanical, electrical and plumbing permits are flat fees based on the home’s floor area, including basements but not garages or covered patios. Each trade needs its own permit.
- A small-work MEP permit covers jobs of $500 or less. Regardless of cost, it also covers residential water heaters up to 100 gallons, water softeners, bath fans, dryer ducts and duct extensions up to 25 feet.
- Escalating penalties can be added for work done without a permit.
Adopted codes and design criteria
For one- and two-family dwellings and townhouses, Twin Falls enforces the 2018 IRC (with Appendices A, B and G), the 2018 IECC, the 2023 National Electrical Code and the 2017 Idaho State Plumbing Code, all with Idaho amendments. Under Idaho Code 39-4116 and a November 26, 2024 City policy, a project is governed by the codes in effect on the date the building permit application is received. That includes the related electrical, mechanical, plumbing and fire permits.
| Criterion | Twin Falls value |
|---|---|
| Ground snow load | 15 psf |
| Minimum roof design load | 25 psf (local ordinance) |
| Frost depth | 24 inches |
| Climate zone | 5B |
| Wind | 115 mph, Exposure B (C in some areas) |
| Seismic design category (IRC) | B |
| Presumptive soil bearing | 1,500 psf |
| Minimum crawl space depth | 30 inches below floor joists |
Local amendments require a 40 psf live load in habitable attics and sleeping rooms, plus specific rebar in stem walls and basement walls: #4 bars top and bottom, vertical bars at 6 feet on center, and reinforcement around openings. Unvented fuel-burning appliances aren’t allowed.
Inspections
Request inspections in the Cityworks portal or by phone:
| Line | Number |
|---|---|
| Building inspection | 208-735-7333 |
| Electrical inspection | 208-735-7235 |
| Plumbing inspection | 208-735-7299 |
| Mechanical inspection | 208-735-7289 |
| Fire Department | 208-735-7338 |
| Engineering inspection | 208-735-3446 |
- Portal requests made by 7:00 a.m. get a same-day inspection. Phone requests for building inspections made after midnight go to the next business day.
- Inspections normally run 8 a.m. to 4 p.m. and aren’t done on City holidays.
- Concrete inspections get priority. You can book AM (8–12) or PM (1–4), and the work must be ready by 8 a.m. or noon. Property lines must be strung and footings at least 12 inches deep.
The residential sequence is:
- footing and setback
- foundation, including shear hold-downs
- shear
- MEP rough-ins
- framing, with truss engineering on site
- insulation
- gypsum, for fire-rated assemblies only
- MEP finals
- building final
You can’t request framing until all rough-ins are signed off, or the building final until all trade finals pass. A re-inspection fee of $50 applies only after a second failure for the same issue and must be paid before rescheduling. Certificates of occupancy can take up to 3 business days to process.
Contractors and owners
Contractors must hold Idaho registration through DOPL, which is required for jobs over $2,000 in materials and labor. Owners doing work on their own property can file the City’s Contractor Registration Exemption Declaration. The City also has a Change of Contractor application for switching contractors mid-project.
Planning a project?
These guides explain the national model-code rules most departments start from. City of Twin Falls Building Safety Department decides what applies in Twin Falls, so use them to prepare your questions.
More Idaho building departments
Not the right office? If your property is outside Twin Falls city limits, one of these may handle it.
Sources
- tfid.org — Building Safety Department
- tfid.org — Building Permit Information
- tfid.org — Permit Requirements
- tfid.org — Inspections
- tfid.org — Building Applications Forms
- cityworks.tfid.org — Login
- tfid.org — Design Criteria Residential
- tfid.org — Inspection Scheduling for Residential Projects
- tfid.org — Policy on Applicable Codes at Time of Application
- tfid.org — 2024 City Building Permit Fee Schedule
- dopl.idaho.gov — Con faq
