Local building department guide · Updated 2026-07-30
Santa Fe Building Department | Permits, Inspections & Contact
Use this guide to find the official City of Santa Fe Land Use Department Building Division, start a permit application, search permit records, schedule an inspection, and locate the correct zoning or plan review contact.
Start here
Quick actions
Apply for a building permit
Review the typical application path and prepare your project details.
See permit stepsTrack or search permits
Find Santa Fe permit search resources and application status links.
Search permitsSchedule a building inspection
Learn what to have ready before requesting your next inspection.
Schedule inspectionEnerGov portal login
Open the department's official online services and permit portal.
Open portalThe City of Santa Fe Land Use Department is the authority having jurisdiction over building permits inside Santa Fe city limits. Santa Fe County and other municipalities have separate local pathways, so a Santa Fe mailing address should be checked against the actual city boundary before an application is started.
Santa Fe building permits and Citizen Self-Service
Santa Fe requires permits for most construction work, including many roofs, window replacements, storage sheds, solar installations, mechanical equipment, re-stuccoing, driveways, walls, fences, manufactured-home placement, additions, and new construction. Eligible primary, express, solar, wall and fence, and trade permits can be submitted through the City’s Citizen Self-Service portal, known as CSS and powered by EnerGov.
For larger commercial, multifamily, residential, pool, accessory-dwelling, or other projects, review the city’s submittal checklists and confirm whether online intake or an appointment is required. Monitor the CSS dashboard for holds, invoices, review comments, and status changes.
Inspections, code compliance, and occupancy
Santa Fe accepts inspection requests through CSS for permit types supported by the portal. The city warns that inspection scheduling may have a two- to three-business-day lag, so requests should be made after the work is complete and ready. Include the permit and inspection information when contacting inspections staff about a cancellation or correction.
Required inspections must be approved before final completion. When a certificate of occupancy or other occupancy approval is required, coordinate final building, fire, planning, historic, and other applicable reviews with the Land Use Department before occupying the space.
Zoning and plan review requirements
Santa Fe’s Land Development Code controls land use and development review. Current planning reviews development applications for compliance with the code and adopted plans. Exterior work in a historic district needs Historic Preservation Division approval, and Santa Fe’s residential green-building requirements may apply to new single-family units, guesthouses, additions, and remodels.
Official contact information
The Land Use Department lists its main line as (505) 955-6571. The Building Division office is at 1600 St. Michaels Drive, Building 24, Santa Fe, New Mexico 87505. Use CSS for eligible applications, permit status, plan-review comments, payments, and inspection requests; email the city’s permit counter when the city instructs you to do so.
Permit process
How to Apply for a Santa Fe Building Permit
Confirm the project scope
Identify the work, property address, project valuation, and whether plans are required.
Prepare your documents
Gather plans, owner and contractor details, site information, and any zoning approvals.
Submit and monitor
Submit through the department’s stated process, pay fees, and watch for review comments.
Field work & closeout
Building Inspections & Code Compliance in Santa Fe
Most permitted work must remain accessible for inspection at defined stages. Before scheduling, check your permit record for the required inspection sequence and make sure the site is safe and ready. Final inspections can be especially important for code compliance and a certificate of occupancy.
Helpful preparation
Keep the permit card or approval number available, confirm the property address, and ask the official office about lead times or reinspection fees.
Planning & review
Zoning and Plan Review Requirements
A building permit is not always the only approval your project needs. Zoning guidelines may affect use, setbacks, height, parking, signage, or lot coverage. Residential and commercial building permits can also follow different plan review tracks, so confirm the correct path before investing in a full plan set.
For a project in Santa Fe, start with the official department below and ask which zoning, planning, conservation, or fire review approvals apply to your address.
Keep this handy
Official Contact Information
| Department | City of Santa Fe Land Use Department Building Division |
|---|---|
| Phone | (505) 955-6571 |
| Address | 1600 St. Michaels Drive, Building 24, Santa Fe, NM 87505 |
| Official website | https://santafenm.gov/land-use/building-permits |
| Last verified | 2026-07-30 |
Official source pages used for this guide
These links were checked on 2026-07-30. Requirements, fees, office hours, and portal addresses can change; use the official source as the final authority.
- https://santafenm.gov/land-use/building-permits
- https://santafenm.gov/land-use
- https://santafenm.gov/land-use/current-planning
- https://santafenm.gov/land-use/inspections-and-enforcement
- https://santafenm-energovpub.tylerhost.net/Apps/selfservice#/home
- https://www.rld.nm.gov/construction-industries/rules-laws-and-building-codes/