An independent guide to local permits & inspections

City building department · New Mexico

Santa Fe building department

Permits, inspections, and official contacts for City of Santa Fe Land Use Department Building Division.

Verified Checked against 6 official sources

Contacts & online services

Office
200 Lincoln Avenue, 1st Floor, Santa Fe, NM 87501
Get directions (opens in a new tab)
Serves
Santa Fe · Santa Fe County
Online services
Applications (EnerGov) · Permit search · Inspections

Check your address first. City of Santa Fe Land Use Department Building Division handles building permits for property inside Santa Fe city limits. Property outside city limits is usually served by Santa Fe County or another municipality, even when the mailing address says Santa Fe.

On this page 9 sections

The City of Santa Fe Land Use Department is the authority having jurisdiction over building permits inside Santa Fe city limits. Its Building Division takes applications online through the Citizen Self-Service (CSS) portal, which runs on Tyler EnerGov, or at in-person appointments, depending on the permit type. The division is on the first floor of Santa Fe City Hall, 200 Lincoln Ave. Use the southwest entrance facing Marcy Street, nearest the Convention Center. In-person intake is by appointment only, on Monday, Tuesday, and Thursday from 9 to 11 a.m. and 1 to 3 p.m. General permit questions go to [email protected]. Don’t mail permit submittals unless the division has authorized it first.

What needs a permit

The city says most construction inside city limits needs a permit. It specifically lists:

  • Re-roofing and window replacement
  • All storage sheds, whatever their size
  • Solar panels
  • New and replacement mechanical equipment
  • Re-stuccoing and driveways
  • Exterior business signs
  • Manufactured home placement

Work that doesn’t need a permit:

Residential Commercial
Interior and exterior painting Interior painting
Minor landscaping Minor landscaping
Carpet, tile, cabinets, countertops Tile and carpet that meet Chapter 3 of the 2009 ANSI standard
Freestanding decks under 120 sq ft —

Exterior work in one of the city’s historic districts must be approved first by the Historic Preservation Division. Most simple maintenance and repair in a historic district doesn’t need a construction permit. See also do I need a permit for a deck.

Online permits vs. appointments

Some permit types can be filed online in CSS:

  • Residential Express: re-roof, re-stucco, window and door replacement, sheds, and decks
  • Commercial Express
  • Solar: residential and commercial
  • Walls and fences
  • Stand-alone trade permits: electrical, mechanical, plumbing/gas, and sewer
  • Secondary trade permits under an active primary permit. These usually don’t need drawings, but intake staff may ask for equipment cut sheets.

Other projects go through appointment intake:

  • New homes, additions, and remodels
  • Accessory dwelling units and accessory structures
  • New commercial and multifamily buildings, commercial tenant improvements, and pools

Email submittals are not accepted except in special cases arranged in advance with the Building Division Manager. Third-party plan review is open only for new commercial buildings.

After you submit, watch your CSS dashboard for holds, review comments, and invoices. Wait five business days before asking for a status update, and expect a reply in three to five business days. To see full permit details in CSS, you must be listed as a contact on the permit.

Revisions go in the “revisions” bin in the Land Use lobby. Drop-off hours are Monday through Thursday, 8 a.m. to 3 p.m., and Friday, 8 to 11 a.m. Number of copies required:

Plan type Copies
Re-roof 2
Solar 2
Pool 3
Residential 4
Commercial 6

No inspections are allowed while a permit amendment is under review.

Fee highlights

Primary permit fees are based on construction valuation. Trade permits carry fixed fees by item. Highlights from the city’s Planning & Land Use fee schedule (effective January 1, 2021):

Item Fee
Residential plan review 50% of the permit fee
Commercial plan review 75% of the permit fee
Solar system permit $100
Green Building Code review (residential) $100 per permit
Electrical, mechanical permit issuance $40 each
Plumbing/gas permit issuance $50
Mandatory pre-submittal meeting, large projects $500
Building without a permit Double the original permit fee
Re-inspection or additional inspection $60/hour, 2-hour minimum
After-hours inspection $85/hour

Permit extensions are requested by email to the permit counter. Each one adds 180 days from the expiration date and costs $100.

Inspections

You can request inspections for every permit type in CSS. You choose a day and an AM or PM slot, but you won’t get a set time. Building inspections may lag two to three business days behind the date you request. Terrain management inspections may lag three to five business days. To cancel, email [email protected] with the permit and inspection numbers. For other inspection questions, call (505) 955-6150. The Inspections & Enforcement Division is on the lower level of City Hall.

Codes and local amendments

Santa Fe enforces these codes:

  • 2021 New Mexico commercial, residential, existing building, plumbing, mechanical, and energy codes
  • 2020 New Mexico Electrical Code
  • 2021 International Fire Code
  • New Mexico earthen building codes
  • ICC A117.1-2017 for accessibility

The city has its own amendments to the plumbing code and the fire code. The Santa Fe Residential Green Building Code applies to all new single-family homes, guesthouses, additions, and remodels.

Every construction site must follow the city’s stormwater best management practices. A site that disturbs one acre or more also has to file an EPA Notice of Intent.

Planning a project?

These guides explain the national model-code rules most departments start from. City of Santa Fe Land Use Department Building Division decides what applies in Santa Fe, so use them to prepare your questions.

More New Mexico building departments

Not the right office? If your property is outside Santa Fe city limits, one of these may handle it.

All New Mexico building departments

Sources

We checked these official pages on October 21, 2026. Fees, forms, and office hours change, so confirm details with the department before you apply.

  1. santafenm.gov — Building permits
  2. santafenm.gov — Land use
  3. santafenm.gov — Inspections and enforcement
  4. santafenm.gov — Adopted construction codes
  5. santafenm.gov — Fee Schedule 2021 1 1
  6. santafenm-energovpub.tylerhost.net — Selfservice

Report an outdated detail · How we research guides