City building department · New Mexico
Farmington building department
Permits, inspections, and official contacts for City of Farmington Building Inspection Division.
Verified Checked against 11 official sources
Contacts & online services
- Phone
- (505) 599-1304
- Office
- 805 Municipal Drive, Annex Building, 2nd Floor, Farmington, NM 87401
Get directions (opens in a new tab) - Serves
- Farmington · San Juan County
- Online services
- Inspections
Check your address first. City of Farmington Building Inspection Division handles building permits for property inside Farmington city limits. Property outside city limits is usually served by San Juan County or another municipality, even when the mailing address says Farmington.
On this page
The City of Farmington Building Inspection Division, part of the Community Development Department, permits and inspects residential and commercial construction inside Farmington city limits. Its staff includes electrical and plumbing/mechanical inspectors. Plans are also routed to Public Works, the Fire Department, and Waste Management for comments. The office is on the second floor of the Annex Building at 805 Municipal Drive, across from City Hall, and is open 8 a.m. to 5 p.m. on weekdays. The division covers property inside city limits only. Aztec and Bloomfield are separate cities.
Permits are in person only
Farmington has no online permits and doesn’t take online payments. You apply and pay at the Annex office. The city accepts:
- Check, money order, or cashier’s check
- American Express, Mastercard, or Visa (by phone if needed)
The city does not accept Discover. Every person or company working in the city, subcontractors included, needs a City of Farmington business license.
What needs a permit
The city says every building erected inside city limits must be permitted. It also says buildings can’t sit over utility easements, in rights-of-way, or over the building line. Its permit list is broad. Permits are required for:
- Decks, porch covers, gazebos, carports, and awnings
- All sheds, including storage and work sheds
- Roofs, including overlays and re-roofs
- Siding, soffit and fascia, and prehung door replacement
- Driveways, sidewalks, and concrete flatwork. Driveways may also need a street cut permit.
- Demolishing interior walls, as well as whole buildings
- Solar panels and hardwired low-voltage work
- Fire protection systems
- Above-ground pools 2 feet deep or more
- Retaining walls and sprinkler systems
Work that doesn’t need a permit:
- Cabinets, countertops, carpet, and tile
- Interior and exterior painting
- Minor landscaping
The FAQ adds that you can do maintenance and repairs without a permit if they involve no structural work and don’t build or remove any wall or partition.
Fences and walls
All fence work needs a permit. That includes any wall or fence 18 inches tall or higher and any replacement. A fence over 6 feet needs a scaled engineering drawing, and a retaining wall over 3 feet must be designed by an engineer. Planning and Zoning reviews setbacks, and Water and Wastewater checks for main lines. Planners answer setback questions at (505) 599-1317. See also do I need a permit for a fence.
Homeowner permits
You can pull a homeowner permit only for your primary residence.
| Work | Homeowner permit? |
|---|---|
| Building, including building your own house | Yes |
| Electrical and plumbing | Yes, after passing a homeowner test |
| Mechanical | No |
| Water or sewer yard line | Yes, but work in the street requires a licensed contractor |
| Lawn irrigation | Yes. A plumbing permit is required. |
For a new house, a homeowner submits two full-size sets of plans with a site plan, an energy checklist, and a Manual J calculation. You can check a contractor’s state license through PSI. Additions or alterations to manufactured or mobile homes go to the state Manufactured Housing Division at (505) 476-4770.
Commercial submittals
Submit hard copies of every commercial application and plan set:
- Up to six sets of drawings for new commercial projects
- Up to four sets for tenant improvements
Electrical, mechanical, and plumbing permits can be filed without drawings, but the city may ask for equipment cut sheets. The Fire Marshal’s Office reviews all new non-residential plans and accepts only digital submittals. At the final inspection, a printed set of as-built plans must be on site, and a digital copy must go to the Fire Marshal’s Office. New buildings get a certificate of occupancy, which is handed to the general contractor in the field. Tenant remodels get a final inspection slip instead.
Fees and permit life
Building permit fees are based on valuation. The fee page says they depend on the construction type, square footage, materials, and applicable codes. Electrical, plumbing, and mechanical permits have fixed fees by type of work. The city doesn’t post a fee table and asks you to call an inspector at (505) 599-1304 for a quote.
A permit is valid for two years from issuance. It becomes void if work doesn’t start within 180 days. Renewing an expired permit takes a new permit and new fees, and possibly a plan check fee. Starting work before the permit is issued can bring civil fines.
Inspections
To schedule an inspection, call (505) 599-1304 with your permit (application) number. Requests must be made a day ahead and are usually done the next business day. Every permit gets a final inspection. City electrical inspectors also perform service-connect inspections throughout the Farmington Electric Utility System service area.
Codes and design criteria
Farmington enforces the state codes adopted under Title 14 NMAC, as amended by Chapter 7 of the City Code. These include:
- 2021 NM Commercial Building, Existing Building, Plumbing, Mechanical, and Energy Conservation codes
- 2020 NM Electrical Code
- 2021 International Fire Code
Local design criteria:
- 20 psf minimum roof live load
- 90 mph basic wind speed (3-second gust)
- 24-inch frost depth
Building permit and plan records are kept for 10 years after a permit is issued.
Planning a project?
These guides explain the national model-code rules most departments start from. City of Farmington Building Inspection Division decides what applies in Farmington, so use them to prepare your questions.
More New Mexico building departments
Not the right office? If your property is outside Farmington city limits, one of these may handle it.
Sources
- farmingtonnm.gov — Building Inspection
- farmingtonnm.gov — Do I need a Construction Permit
- farmingtonnm.gov — Faq
- farmingtonnm.gov — Manual of Fees
- farmingtonnm.gov — Residential Building Requirements
- farmingtonnm.gov — Commercial Building Requirements
- farmingtonnm.gov — State of NM Adopted Construction Codes
- farmingtonnm.gov — Schedule Inspections
- farmingtonnm.gov — Mobile Homes Manufactured Housing
- farmingtonnm.gov — To Obtain Permit Inquiry
- farmingtonnm.gov — Building Inspections
