City building department · New Mexico
Roswell building department
Permits, inspections, and official contacts for City of Roswell Building Inspections Division.
Verified Checked against 7 official sources
Contacts & online services
- Phone
- (575) 637-6280
- Office
- 400 W. 2nd Street, Roswell, NM 88201
Get directions (opens in a new tab) - Serves
- Roswell · Chaves County
- Online services
- Applications · Inspections
Check your address first. City of Roswell Building Inspections Division handles building permits for property inside Roswell city limits. Property outside city limits is usually served by Chaves County or another municipality, even when the mailing address says Roswell.
On this page
The City of Roswell Building & Inspections Division, part of Community Development, issues building, plumbing/mechanical, and re-roofing permits and inspects construction inside Roswell city limits. Electrical work is different. As of January 1, 2026, and until further notice, the New Mexico Construction Industries Division (CID) reviews electrical plans, issues electrical permits, and performs electrical inspections in Roswell. Building, plumbing, and mechanical permits are applied for, tracked, and inspected through the city’s Cloudpermit portal. New users have to register with an email address.
Electrical work goes to the state
CID’s December 30, 2025 notice to Roswell says CID will handle all electrical permits and inspections for the city until further notice. The details:
- Each electrical permit the city had already issued must be converted to a CID conversion permit, at a minimum fee of $45.
- New electrical work pays CID’s regular permit and inspection fees.
- Contractors can apply online or at a CID office in Santa Fe, Albuquerque, or Las Cruces.
- If you file a conversion permit online, contact a CID office when you reach the payment screen so staff can change the fee to $45.
- Schedule electrical inspections through your CID account, by calling the CID inspection center at (505) 222-9813 or 1-877-243-0979, or by emailing [email protected].
The city’s building page names a CID inspector as the primary electrical inspector for the Roswell area.
What needs a permit
Roswell’s residential permits page lists the following:
| Project | Permit required? |
|---|---|
| Fence | Yes |
| Storage shed or carport | Yes |
| Renovations or additions | Yes |
| Patio cover, gazebo, deck, pergola, or porch | Yes |
| Pool | Yes |
| Landscape sprinkler system | Yes |
| Curb cut, sidewalk, or drive pad | Yes |
| Re-roofing | Yes |
| Plumbing (sewer, water conditioners, drain repair, fixtures) | Yes |
| Exterior painting | No |
| Simple landscaping such as pavers or flower beds, or planting a garden | No |
The city’s residential checklist adds that every new roof, re-roof, and roof coating needs a building permit. At a minimum, roofs get a decking inspection after the old roof is removed and a final inspection.
Sheds and fences
Fences and small accessory structures use a Placement Permit instead of a full building permit. The cutoff is size:
| Property type | Placement permit | Full building permit |
|---|---|---|
| Residential | Sheds 200 sq ft or smaller | Sheds over 200 sq ft |
| Commercial | Sheds 120 sq ft or smaller | Sheds over 120 sq ft |
See also do I need a permit for a shed.
Who can apply and what to submit
The checklist follows state rules. Only a person with a current, valid state license can apply for a permit. A residential property owner may get a homeowner’s permit within the limits of 14.5.2.18 NMAC. Roswell has a separate Homeowner’s Plumbing application. Building, electrical, mechanical/plumbing, and LP gas work each need their own permit.
A residential application needs two sets of:
- Plans, including a site plan with setbacks and a drainage plan
- Specifications and engineering calculations
- Exterior wall envelope details
- Soil or geotechnical reports
The city requires density and compaction tests before any foundation pour. Before the certificate of occupancy is issued, you also submit the IECC thermal bypass and duct-sealing checklists. Commercial projects have their own plan checklist.
Fees
Building permit fees come from the city’s valuation table. Some examples:
| Project valuation | Permit fee |
|---|---|
| $0–$549 | $24 |
| $4,500–$5,499 | $111 |
| $9,500–$10,499 | $171 |
| $19,500–$20,499 | $321 |
| $49,500–$50,499 | $644 |
| $99,500–$100,499 | $994 |
| $100,500–$200,499 | $1,554 |
| $400,500–$500,499 | $3,234 |
Codes and design criteria
Roswell’s code sheet, dated July 15, 2026, lists:
- 2021 IBC, IRC, and IEBC, adopted as the New Mexico commercial, residential, and existing building codes
- 2021 IECC, UMC, and UPC
- 2020 NEC
- 2024 International Fire Code
- 2017 ANSI A117.1 for accessibility
Local design criteria:
- Basic wind speed: 115 mph, surface roughness category B
- Frost depth: 12 inches
- Climate zone: 3B
Building, plumbing, and mechanical inspections are requested in Cloudpermit. The building page asks you to contact the building official about all building permit inspections until further notice.
Planning a project?
These guides explain the national model-code rules most departments start from. City of Roswell Building Inspections Division decides what applies in Roswell, so use them to prepare your questions.
More New Mexico building departments
Not the right office? If your property is outside Roswell city limits, one of these may handle it.