City building department · Minnesota
Rochester building department
Permits, inspections, and official contacts for City of Rochester Community Development and Building Safety.
Verified Checked against 11 official sources
Contacts & online services
- Phone
- (507) 328-2600
- Office
- Development Services & Infrastructure Center, 4001 West River Parkway NW, Rochester, MN 55901
Get directions (opens in a new tab) - Serves
- Rochester · Olmsted County
- Online services
- Applications (Accela) · Permit search · Inspections
Check your address first. City of Rochester Community Development and Building Safety handles building permits for property inside Rochester city limits. Property outside city limits is usually served by Olmsted County or another municipality, even when the mailing address says Rochester.
On this page
Building Safety, part of Rochester’s Community Development Department, reviews plans, issues building and trade permits, and inspects construction inside Rochester city limits. Its front desk is in the Development Services & Infrastructure Center on West River Parkway NW, not at City Hall downtown. Property in the surrounding Olmsted County townships is outside the city’s permit authority.
Applying through Accela Citizen Access
Rochester takes building, trade and most related applications through Accela Citizen Access, which is available around the clock for applying, uploading plans, paying fees, looking up records and scheduling inspections. Demolition has its own application form on the building-permits page. A building permit does not cover trade work: electrical, mechanical (HVAC) and plumbing each need a separate permit.
A permit stays valid while work progresses, but it expires after 180 days with no inspection or contact with the department. Reviving an expired permit means a renewal and the fees that go with it.
Re-roofing, re-siding and window replacement
Since May 1, 2025, Rochester requires a building permit and inspections for residential re-roofing, re-siding and window replacement, covering single-family homes, two-family homes and townhouses (commercial and multifamily buildings already needed them).
| Project | Plans required | Inspections | 2026 permit fee |
|---|---|---|---|
| Re-roofing | Simplified roof plan | Sheathing, underlayment, final | $100 (no plan review fee) |
| Re-siding | None | Wall sheathing, weather barrier, final | $100 |
| Window/door replacement | Simplified floor plan | Framing, weather barrier, final | $130 (1–3 units), $175 (4–10), $220 (11+) |
Homeowners may do this work themselves without a state license. Contractors need the right Minnesota credential, which the city checks at submittal: a state roofing contractor license for roofs, and a Residential Building Contractor license for anyone doing both siding and windows, because the state treats those as two separate specialty skills.
2026 fee highlights
Fees come from the city’s 2026 Master Fee Schedule (adopted December 1, 2025, amended August 3, 2026). Building permit fees are based on the total valuation of the work:
| Valuation | Building permit fee |
|---|---|
| $1–$500 | $25 |
| $501–$2,000 | $25 for the first $500, plus $2 per additional $100 |
| $2,001–$25,000 | $55 for the first $2,000, plus $9 per additional $1,000 |
| $25,001–$50,000 | $262 for the first $25,000, plus $6.50 per additional $1,000 |
| $50,001–$100,000 | $424.50 for the first $50,000, plus $4.50 per additional $1,000 |
| $100,001–$500,000 | $649.50 for the first $100,000, plus $3.50 per additional $1,000 |
Other building-division charges in the same schedule:
- Plan review: 65% of the building permit fee, or 25% for similar plans based on an approved master plan.
- Trade permits: $25 application fee plus $10 per $1,000 of valuation above $500. Flat appliance permits include a furnace ($77.50), an air conditioner ($56.25), both together ($98.50) and water heaters ($45.60–$45.80).
- Hourly items: re-inspections, additional plan review and inspections not otherwise listed are $75 per hour, with a one-hour minimum. Inspections after hours are $75 per hour, with a two-hour minimum.
- Work without a permit: $100 the first time, $150 the second and $200 the third.
- Residential footing/foundation permit: $100.
The city also licenses some trades locally. Heating contractors pay $125, and sewer-and-drain and cement or asphalt sidewalk contractors pay $90 each.
Codes in force
The city’s building-code page lists the 2020 Minnesota Residential Code and the 2020 Minnesota Conservation Code for Existing Buildings (effective March 31, 2020), the 2020 Minnesota Mechanical and Fuel Gas Code, and the Minnesota Plumbing Code. Projects permitted before March 31, 2020 stay under the 2015 Minnesota Residential Code. Statewide, DLI lists the 2024 Minnesota Commercial Energy Code (effective January 5, 2024). Electrical permits filed on or after August 17, 2026 must meet the 2026 National Electrical Code. Rochester’s own building, electrical, HVAC, plumbing and heritage preservation rules are in Title 4 of the city code. Chapter 4-1 requires residential building contractors to hold a state license. Landlords may do carpentry on their own rental properties, but trade work there must be done by professional contractors.
Inspections
Building Safety schedules inspections only after the permit is approved, paid and issued. You can book through Accela Citizen Access, by phone at 507-328-2600 during office hours, by email at [email protected], or in person at the 4001 West River Parkway front desk.
Zoning, ADUs and right-of-way work
Planning and Zoning applies the Unified Development Code. Most new development needs a zoning certificate, which requires a site plan. The 2026 schedule charges $35 for a staff-authorized certificate, and the fee doubles if construction starts before the certificate is issued. A zoning compliance letter ($140 for a single-family property, $210 for other properties) states a property’s zoning, whether its use is permitted, and any open violations. Rezonings, subdivisions, conditional use permits and site development plans go through the online Land Development Application.
Rochester allows one accessory dwelling unit per lot, up to 1,000 square feet. A detached ADU must be in the side or rear yard and match the style of the main house. The city suggests a pre-development meeting with staff, held on Thursdays at 1 p.m., before construction documents are drawn up. Each ADU ends with a certificate of occupancy.
Work in the public right-of-way is handled separately by Public Works. This includes sewer and water services from the main to the building, driveway aprons, sidewalks and street obstructions. Permits are requested at [email protected] or 507-328-2406. Utility and concrete inspections are booked through the Public Works desk at 507-328-2400, from 8:00 a.m. to the last slot at 3:00 p.m. Commercial and multifamily sites need electronic plan submittal. Community Development will not approve a certificate of occupancy until any required tracer-wire box on a poly water service is installed and inspected.
Planning a project?
These guides explain the national model-code rules most departments start from. City of Rochester Community Development and Building Safety decides what applies in Rochester, so use them to prepare your questions.
More Minnesota building departments
Not the right office? If your property is outside Rochester city limits, one of these may handle it.
- City of Bloomington Building and Inspections Division
- City of Brooklyn Park Building Inspection Division
- City of Duluth Construction Services and Inspections
- City of Minneapolis Development Review and Construction Code Services
- City of Saint Paul Department of Safety and Inspections
- City of St. Cloud Building Safety Department
Sources
- rochestermn.gov — Building permits
- rochestermn.gov — Building inspections
- rochestermn.gov — Building code
- rochestermn.gov — Accessory dwelling units adus
- rochestermn.gov — Planning zoning applications
- rochestermn.gov — Fee schedule
- media-002-us.cdn.govstack.com — 2026 master fee schedule ammendedv5 final for ordinance
- rochestermn.gov — Permit and inspection information ada passed x2
- aca-prod.accela.com — Default
- dli.mn.gov — 2020 minnesota state building codes
- dli.mn.gov — Electrical codes and standards
