City building department · Vermont
Rutland building department
Permits, inspections, and official contacts for City of Rutland Building Department.
Verified Checked against 8 official sources
Contacts & online services
- Phone
- (802) 774-7820
- Office
- 1 Strongs Avenue, Rutland, VT 05702
Get directions (opens in a new tab) - Serves
- Rutland · Rutland County
- Online services
- Applications · Permit search · Inspections
Check your address first. City of Rutland Building Department handles building permits for property inside Rutland city limits. Property outside city limits is usually served by Rutland County or another municipality, even when the mailing address says Rutland.
On this page
Rutland City’s Building Department, located in City Hall, issues building permits, certificates of occupancy, certificates of completion, vacant building registrations, and short-term rental registrations. It works alongside the city’s Planning & Zoning Department, which handles zoning permits, subdivisions, boundary line adjustments, signs, and Development Review Board (DRB) applications. The city notes that most renovation projects need both a city permit and, where the building is covered by state rules, a Vermont Division of Fire Safety permit.
Which Rutland permits a project needs
The city’s building permit page sorts common projects into two groups:
| Project | City permits required |
|---|---|
| Decks, sheds, garages, porches, additions, pools, new houses, new commercial buildings | Building permit and zoning permit |
| Interior remodels (kitchen, bathroom, etc.), rebuilding existing decks or stairs at the same size | Building permit only |
| Demolition | Building permit, plus an asbestos survey |
| New or expanded driveway | May need a curb cut permit from the Department of Public Works and Zoning Administrator approval |
A permit expires by limitation if no work begins within six months of issuance, and a new permit must then be obtained before starting.
How to apply
Rutland stopped taking paper applications and uses GovPilot online forms at eforms-main.govpilot.com/VT/rutlandcityvt. Building permit applications need floor plans or sketches. Demolition applications need the asbestos survey. Zoning, subdivision, boundary line adjustment, and sign applications are separate GovPilot forms linked from the Planning & Zoning permit applications page.
The city warns that its GovPilot applications do not save progress. Have every attachment ready (site plans, building plans, renderings) before you start. Applications missing required attachments are treated as incomplete and are not reviewed. Projects that need DRB or Architectural Review Committee approval require additional forms.
Fees (schedule effective January 1, 2023)
The Board of Aldermen approved the current Building & Zoning fee schedule on August 15, 2022. Highlights:
| Item | Fee |
|---|---|
| Building permit application | $50 + state recording fees |
| Zoning permit application | $50 + $5 15-day notice fee + recording fees |
| Shed (up to 200 sq ft), outdoor hot tub, above-ground pool | $25 ancillary fee |
| In-ground pool | $100 ancillary fee |
| Accessory structures | $0.15 per sq ft |
| Primary and attached structures | $0.20 per sq ft of gross habitable floor area |
| Demolition | $50 |
| Permit revision | $25 |
| After-the-fact permit | 2x application and ancillary fees |
| Development Review Board application | $150 + $5 notice fee |
Unfinished basements and attics are left out of the square-foot calculation. When a project needs both a building and a zoning permit, the ancillary fee is charged only once, and it is refunded if the application is denied. The Planning & Zoning page lists recording fees at $15 per page. If you are planning an addition or new home, the building permit cost guide explains how square-foot fees like these compare with value-based schedules.
Certificate of occupancy inspections
Rutland requires a certificate of occupancy (CO) inspection for every property sale or ownership transfer, every refinancing, and every change of tenant in a rental. Building permit completions get a certificate of completion. To schedule, open the GovPilot portal and choose the light-blue “Certificate of Occupancy Application” button. The department currently books CO inspections with a 1–2 week lead time. Once inspected, the inspector has three business days to approve or to issue a written denial with reasons.
CO fees from the 2023 schedule:
- Residential change of tenancy: $25 per dwelling unit
- Real estate transaction or conveyance: $100
- Urgent scheduling (same day or next business day): double the fee, at the department’s discretion
- After-the-fact CO: 5x the permit fee, up to $500
- Cancelling during a scheduled appointment forfeits the fee and counts as an automatic denial. You must reapply and pay again.
Vacant buildings and short-term rentals
Owners must register a vacant property within four months of it becoming vacant. Registration costs $100, and missing the deadline brings a $500 penalty. Short-term rentals such as Airbnb and Vrbo units must register with the city every year, for $375. That fee includes the annual CO inspection.
Codes
Local building regulations are in Title 9 (Buildings) of the city code. For buildings covered by state rules, the 2025 Vermont Fire & Building Safety Code took effect November 6, 2025. It adopts the 2021 IBC, NFPA 1 and NFPA 101 (2021), the 2023 National Electrical Code, and the 2024 International Plumbing Code.
Contacts and hours
City Hall is at 1 Strongs Avenue, Rutland, VT 05702 (mailing: PO Box 969). The office is open 8:00 a.m.–4:00 p.m., Monday–Friday.
- Building Inspector Mark Sadakierski: (802) 774-7820, [email protected]
- Assistant Building Inspector/Health Officer Michael Brookman: (802) 774-7817
- Code Enforcement: (802) 774-7818
- Office Coordinator: (802) 774-7803
- Planning Director/Zoning Administrator Ed Bove: (802) 774-7833
- City Hall main line: (802) 773-1800
Planning a project?
These guides explain the national model-code rules most departments start from. City of Rutland Building Department decides what applies in Rutland, so use them to prepare your questions.
More Vermont building departments
Not the right office? If your property is outside Rutland city limits, one of these may handle it.
- City of Barre Planning, Permitting and Assessing Services
- Town of Brattleboro Planning Services
- City of Burlington Department of Permitting and Inspections
- City of Montpelier Planning and Community Development
- City of Saint Albans Planning and Permitting Office
- City of South Burlington Planning and Zoning Department
Sources
- rutlandcity.org — Building department
- rutlandcity.org — Building permit information
- rutlandcity.org — Certificates of occupancy
- rutlandcity.org — 2023 Fee Schedule
- rutlandcity.org — Planning zoning department
- rutlandcity.org — Permit applications
- eforms-main.govpilot.com — Rutlandcityvt
- firesafety.vermont.gov — Codes