County building department · Florida
Miami-Dade County building department
Permits, inspections, and official contacts for Miami-Dade County Building Department.
Verified Checked against 10 official sources
Contacts & online services
- Phone
- (786) 315-2000
- Office
- 11805 SW 26th Street, Miami, FL 33175
Get directions (opens in a new tab) - Serves
- Miami-Dade County
- Online services
- Applications · Permit search · Inspections
Check your address first. Miami-Dade County Building Department is a county-level office. County building departments usually serve unincorporated areas, while cities and towns inside Miami-Dade County may run their own departments or contract with the county.
On this page
Miami-Dade County’s Construction, Permitting and Building Code Division, part of the Department of Regulatory and Economic Resources (RER), issues permits only for unincorporated Miami-Dade County. Those properties have folio numbers beginning with 30. Every municipality in the county has its own Building Official, so if a folio starts with any other number, apply to that city. The Property Appraiser’s search shows a property’s folio.
In-person service is at the Permitting and Inspection Center, 11805 SW 26th Street, open 7:30 a.m.–4 p.m. Monday–Friday, except legal holidays. Homeowners and small businesses can book permitting-guidance appointments with the Small Business and Homeowners Assistance Team (CHAT) through MeetQ. Other useful lines:
- Permit Section: (786) 315-2100, for process numbers, revisions, and inspection help
- Zoning: (786) 315-2660, for Zoning Improvement Permits
- Contractor Licensing: (786) 315-2880
Which permit you need
- Building permit: New structures, alterations, repairs, and demolition.
- Zoning Improvement Permit (ZIP): Work that doesn’t need a building permit but still has to meet zoning standards, such as chain-link fences, non-roofed pergolas, and canvas awnings.
- Trade permits: Roofing, electrical, plumbing, and mechanical work, either on their own or under a master building permit.
How to apply
- Submit the Permit Application/Document Submission form and files through the county’s EPS Portal. You’ll get an upload confirmation number (UP#).
- Intake staff screen the submittal and assign a process number starting with C, N, or M.
- Pay the upfront fees. Plans are not reviewed until they’re paid. The upfront fee covers one initial review and one rework per discipline, and later reworks are billed separately.
- Initial review takes 24 hours to 10 business days depending on the project, and so does each rework. Reviews can include building, structural, and trade; zoning, impact fees, and Public Works; environmental and flood (DERM); and, when needed, Water and Sewer, Fire Rescue, or the Florida Department of Health.
- Pay the remaining fees and print the permit card, which lists the required inspections.
Bring a building permit application signed by the owner and notarized, a contact sheet, and a scaled plan showing the site, floor plan, finished floor elevation, and structural and trade details. Complex projects need plans digitally signed and sealed by a licensed architect or engineer. Licensed contractors can pull roofing, storm panel, accordion shutter, and electrical, mechanical, or plumbing permits that don’t need plan review through the separate E-Permitting system.
Owner-builders may act as their own general contractor. Before the permit is issued, they sign a form acknowledging their responsibilities.
Time limits:
- Applications (process numbers) are valid for 180 days.
- Issued permits expire if no approved inspection happens within 180 days. Each approved inspection on the master permit or any sub-permit extends it another 180 days.
- A Notice of Commencement may be required for improvements over $5,000, or over $15,000 for A/C repair or replacement.
Exemptions
HB 803 (from July 1, 2026): Projects under $7,500 on single-family homes, duplexes, townhouses, and their accessory structures can skip the building permit if the owner or contractor submits a written exemption request and the contract through the portal. The exemption does not cover:
- Properties partly or fully in a flood hazard area
- Multi-family units
- Electrical, plumbing, mechanical, gas, or structural work, which includes windows, doors, wind-resistant fences, and sheds
Local exemptions for single-family homes, duplexes, townhouses, and condo units: These are capped at $5,000 total in any 12-month period.
| Work | Notes |
|---|---|
| Chain-link fence (not a pool barrier) | Zoning Improvement Permit required |
| Non-roofed pergola or trellis | Zoning Improvement Permit required |
| Wood deck 18 inches or less above ground | No permit |
| Outdoor slabs, patios, walkways, pavers | No permit (not screened-patio or pool slabs) |
| Rain gutters; screening an existing covered patio | No permit |
| Window A/C unit replacement | No permit |
| Licensed electrical or plumbing repairs up to $500 | No permit |
An exact A/C change-out of the same amperage doesn’t need an electrical permit, but it does need a mechanical permit.
Fees
The Board of County Commissioners adopted a revised building fee schedule on June 30, 2025, and it took effect October 1, 2025. It was the first increase in more than 17 years. Electrical, mechanical, and plumbing/gas applications must include the matching permit fee sheet. Fire Rescue, DERM, and impact fees (road, fire, police, parks, schools) are assessed separately. After a Notice of Violation for unpermitted work, the permit costs double, meaning the regular fee plus 100%. Refunds aren’t issued on permit fees of $130 or less.
Inspections
- Scheduling: Book online, or through the Permit Counter at (786) 315-2100, by 4 p.m. on the business day before the inspection. You need the permit number and the three-digit inspection code from the permit card.
- Same-day cancellations: Only between 6 and 8 a.m.
- Inspection hours: 8 a.m.–3:30 p.m., Monday–Friday. Routes are set between 7 and 8:15 a.m., and the Inspection Tracking page then shows your stop and the inspector’s photo. Inspectors take calls only from 7 to 8 a.m.
- Virtual inspections: Run over WhatsApp or Teams. On-demand same-day virtual inspections are available through MeetQ for some electrical, A/C change-out final, and residential pool-piping inspections.
- Overtime inspections: The request must be submitted by 2 p.m. to be handled the same day.
- On site: Keep the stamped approved plans and permit card at the job, post the address so it’s visible from the street, and have an OSHA-approved ladder ready for roofing inspections.
Planning a project?
These guides explain the national model-code rules most departments start from. Miami-Dade County Building Department decides what applies in Miami-Dade County, so use them to prepare your questions.
More Florida building departments
Not the right office? If your property is outside Miami-Dade County, one of these may handle it.
Sources
- miamidade.gov — Home.page
- miamidade.gov — Contact us.page
- miamidade.gov — Homeowners general permit info.page
- miamidade.gov — How to apply for permit.page
- miamidade.gov — Permit.page
- miamidade.gov — Building permit fees.page
- miamidade.gov — Inspections.page
- miamidade.gov — Online services.page
- miamidade.gov — EPSPortal
- miamidade.gov — Permits
