City building department · Washington
Tacoma building department
Permits, inspections, and official contacts for Tacoma Planning and Development Services.
Verified Checked against 13 official sources
Contacts & online services
- Phone
- (253) 591-5030
- Office
- 747 Market Street, Third Floor, Tacoma, WA 98402
Get directions (opens in a new tab) - Serves
- Tacoma · Pierce County
- Online services
- Applications (Accela) · Permit search · Inspections
Check your address first. Tacoma Planning and Development Services handles building permits for property inside Tacoma city limits. Property outside city limits is usually served by Pierce County or another municipality, even when the mailing address says Tacoma.
On this page
Tacoma Planning and Development Services (PDS) issues building, mechanical, plumbing, demolition, fire-protection, site-development, right-of-way, utility-connection, and land-use permits inside the City of Tacoma. Unincorporated areas around the city, including some with Tacoma mailing addresses, are permitted by Pierce County Planning and Public Works. Electrical inspections are scheduled with Tacoma Public Utilities rather than through PDS.
Applying in Accela
Tacoma’s permit platform is Accela Citizen Access (aca-prod.accela.com/tacoma). New users create an account and can follow the city’s Getting Started Guide, and TacomaPermits.org hosts tip sheets, the fee estimator, and status tools. Applications take one of three routes:
- E-permits (online only, no plan review): residential irrigation backflow preventers, roof overlays, and water-connection repairs, plus some commercial reroofs and fire alarm, transmitter, and sprinkler permits.
- Over-the-counter (OTC): for residential work this includes window replacement, woodstoves, siding, like-for-like HVAC replacement, heat pump or furnace installation, water heater replacement, re-piping, and full demolition.
- Plan review: new buildings, additions, and alterations such as decks, dormers, and retaining walls. Submittals must follow the city’s Electronic File Standards, and PDS publishes a residential submittal checklist.
Tacoma’s residential permit types are BLDRN (new building), BLDRA (alteration), DEMOR (demolition), FIRER (fire protection), MECH (mechanical), and PLMB (plumbing).
Pre-application and coaching
Residential coaching is free for single-family homes, duplexes, and ADUs. For larger projects, the 2026 fee schedule lists two paid pre-application options:
- Option A, an electronic review with a comment memo, costs $1,670.
- Option B, which adds an in-person meeting and a post-meeting memo, costs $3,330.
The pre-application fee can be credited toward up to 100% of the building plan review fee if you apply for the permit within one year.
Work exempt from a Tacoma building permit
| Item | Exempt when… |
|---|---|
| Detached accessory structure | One story, floor area 200 sq ft or less |
| Fence | Not over 7 feet high |
| Retaining wall | Not over 4 feet (bottom of footing to top of wall), unless supporting a surcharge |
| Deck | 200 sq ft or less, no more than 30 inches above grade at any point, not attached to the dwelling |
| Reroof (single-family or duplex) | Existing covering removed first, new material 2.5 lb/sq ft or less, no framing changes, not unreinforced masonry |
| Water tank | 5,000 gallons or less |
| Prefabricated pool | Less than 24 inches deep |
Stopping leaks in drain, water, waste, or vent pipe is exempt, but replacing the pipe is not. Exempt work still has to meet zoning. For more on deck rules, see do I need a permit for a deck.
Adopted codes
For permits vested after March 15, 2024, Tacoma enforces the 2021 IBC (with Appendix E and a local Appendix G), IRC, IEBC, IMC, Uniform Plumbing Code, and IFC, plus the Washington State Energy Code (WAC 51-11C and 51-11R). Local amendments are in Tacoma Municipal Code Title 2 (TMC 2.02) and TMC 3.02.
2026 fee highlights
The PDS fee schedule effective January 1, 2026 sets these fees:
| Item | Fee |
|---|---|
| Single-family/duplex new construction (building, mechanical, plumbing) | 1.31% of ICC building valuation |
| Single-family/duplex additions and remodels | 2.81% of ICC valuation (remodel minimum $180) |
| Residential plan review | 45% of building permit fee |
| Commercial/multifamily plan review | 65% of permit fee |
| Residential remodel e-permit | $140 minimum |
| Plumbing or mechanical e-permit | $140 |
| Demolition (house, duplex, accessory building) | $190 |
| Reinspection | $190 each |
| Temporary Certificate of Occupancy | $460 |
| Minimum counter transaction | $94 |
| Work without a permit | Double the permit and plan review fees, or $350, whichever is greater |
Surcharges are added on top of these: 5% technology, 5% emergency preparedness, 5% natural resources (on building permits), and a 2% reserve fund. For alterations, PDS values the work using its Alteration Valuation Table, which applies 20%, 40%, 60%, or 80% of ICC Building Valuation Data depending on scope.
Inspections
You can request inspections by text, phone, or online through TacomaPermits.org, all available 24 hours. Requests received by 3 p.m. are scheduled for the next day. On the morning of the inspection, call the inspector between 7:30 and 8:30 a.m. to get a roughly two-hour window, since inspectors may arrive as early as 8 a.m. Other rules:
- An adult 18 or older must be on site, and the approved plans and permit card must be at hand.
- Lockbox access is allowed only if no personal possessions are on the site.
- Cancel by 6 a.m.
- For electrical inspections, call Tacoma Public Utilities at (253) 502-8277.
Separately, the Tacoma Fire Department runs an annual inspection program for commercial, multifamily, and industrial buildings.
Permit counter and contacts
The permit counter is on the Third Floor of the Tacoma Municipal Building, 747 Market Street. Walk-in service runs 9 a.m. to 1 p.m., Monday through Thursday, and appointments can be booked online. Phone support at (253) 591-5030 runs 8 a.m. to 5 p.m. weekdays, and the email is [email protected]. Permit and inspection status are available after logging in to Accela.
Planning a project?
These guides explain the national model-code rules most departments start from. Tacoma Planning and Development Services decides what applies in Tacoma, so use them to prepare your questions.
Nearby building departments
Not the right office? If your property is outside Tacoma city limits, one of these may handle it.
Sources
- tacoma.gov — Planning and development services
- tacoma.gov — Permits and development services
- tacoma.gov — Apply for permits
- tacoma.gov — Residential permits
- aca-prod.accela.com — Default
- tacomapermits.org — Permit status
- tacomapermits.org — Inspections
- tacomapermits.org — Building code library
- tacomapermits.org — Building valuation
- tacomapermits.org — Fee updates
- tacomapermits.org — Fee Schedule Effective January 1 2026
- tacoma.gov — Building inspection program
- cms.tacoma.gov — Title02 Buildings
