County building department · Washington
Pierce County building department
Permits, inspections, and official contacts for Pierce County Planning and Public Works Development Center.
Verified Checked against 18 official sources
Contacts & online services
- Phone
- (253) 798-3739
- Office
- 2401 S 35th St, Tacoma, WA 98409
Get directions (opens in a new tab) - Serves
- Pierce County
- Online services
- Applications · Permit search · Inspections
Check your address first. Pierce County Planning and Public Works Development Center is a county-level office. County building departments usually serve unincorporated areas, while cities and towns inside Pierce County may run their own departments or contract with the county.
On this page
Pierce County Planning and Public Works runs the Development Center, which handles building, land-use, site-development, environmental, sewer, and fire-prevention permits for unincorporated Pierce County. Tacoma, Puyallup, Lakewood, Gig Harbor, and the county’s other incorporated cities issue their own permits. A city mailing address does not settle jurisdiction, so check the parcel with the county’s property tools before you apply.
Applying through PALS+
Pierce County takes applications through PALS+, its online permit portal. The residential process starts with a Submittal Standard: you upload a site plan to PALS+, and the county responds with a list of what a complete application must include for that property. Applications are accepted only when complete, under Pierce County Code 18.40.020. The county publishes a Residential Construction Application and Checklist and a Customer Guide for Residential Construction (both revised in 2026) that define the required items. Larger or less certain projects can use the county’s pre-application services first.
Construction plans must be designed to the 2021 International codes, the 2021 Uniform Plumbing Code, and the 2021 Washington State Energy Code, as adopted by the state.
Work exempt from a building permit
The county’s “Work Exempt from Building Permit” guide and its Development Center FAQs list these thresholds:
| Item | Exempt when… |
|---|---|
| Accessory structure (tool or storage shed, playhouse) | Single story, floor area 200 sq ft or less |
| Deck, sidewalk, driveway | Walking surface 30 inches or less above adjacent grade and not over a basement or story below |
| Fence | 6 feet or less in height |
A fence 6 feet or under can sit on the property line without a permit, but it must still meet the intersection sight-distance rules in Pierce County Code Titles 17A and 17B. A taller fence needs a building permit and must meet setbacks. Exempt sheds must still meet the setbacks in PCC 18A.15.040. The exemption does not cover habitable or heated space, tiny homes, or additions and remodels to existing structures. For more on fences, see do I need a permit for a fence.
Zoning and related reviews
Zoning is governed by Pierce County Code Title 18A. The county’s “What Is Allowed in a Zone” guidance uses an address or parcel search to identify allowed uses, setbacks, and variance options. Land use, land division, and civil infrastructure reviews are also handled at the Development Center.
2026 fee changes
New Pierce County development fees took effect February 1, 2026, under Exhibit A to Ordinance O2025-550s, which covers both 2026 and 2027. The county announced that most permitting fees would rise by about 20% on average, and that it was adding a 3% technology fee and a $150 administrative base fee. The county also publishes an estimate of typical building permit costs for a single-family home.
Inspections
Building inspections are scheduled in PALS: search for the permit, then choose “I want to…” and “Schedule Inspection.” For single-family site-development inspections, requests made before 11 a.m. on a working day are normally done the next working day. The county’s FAQ says inspectors are usually reachable by phone between 6:30 and 7 a.m., before they head out for the day.
Virtual inspections use a smartphone video stream controlled by the person on site. They are allowed for water heater and furnace replacements, footings and foundations for additions, insulation, re-inspections, and finals. Call (253) 798-2769 to book one. The county publishes separate “Inspections Required” guides for residential and commercial work.
Commercial and business occupancies must receive a Certificate of Occupancy before the space is used. A temporary certificate does not replace final approval.
Development Center hours and contact
The Development Center is in the Pierce County Annex, 2401 S 35th St, Tacoma, WA 98409 (east entrance). The lobby is open 9 a.m. to 2 p.m.:
- Monday, Wednesday, and Friday: full in-person service
- Tuesday and Thursday: basic services only
General office hours are 8 a.m. to 4 p.m., and the main line is (253) 798-3739. Live chat is available during lobby hours, and emailed questions are answered within 24 to 48 hours on weekdays.
Planning a project?
These guides explain the national model-code rules most departments start from. Pierce County Planning and Public Works Development Center decides what applies in Pierce County, so use them to prepare your questions.
Nearby building departments
Not the right office? If your property is outside Pierce County, one of these may handle it.
Sources
- piercecountywa.gov — Applyforapermit
- piercecountywa.gov — Development Center
- piercecountywa.gov
- pals.piercecountywa.gov — Palsonline
- piercecountywa.gov — What Is Allowed in a Zone
- piercecountywa.gov — Land Use Land Division Civil Infrastruct
- piercecountywa.gov — Faq
- piercecountywa.gov — Guide Work Exempt From Permit
- piercecountywa.gov — Bulkheads Fences and Retaining Walls
- piercecountywa.gov — Garages Sheds and Decks
- piercecountywa.gov — Faq
- piercecountywa.gov — Guide Inspections Required Residential
- piercecountywa.gov — View
- piercecountywa.gov — Residential Construction Application Checklist
- piercecountywa.gov — Customer Guide for Residential Construction
- piercecountywa.gov — Fee Handout Exhibit A 2026 and 2027
- piercecountywa.gov — Detail
- piercecountywa.gov — PPW Procedure Temporary Certificate of Occupancy
