City building department · Connecticut
Norwalk building department
Permits, inspections, and official contacts for City of Norwalk Building and Code Enforcement.
Verified Checked against 13 official sources
Contacts & online services
- Phone
- (203) 854-7755
- Office
- 125 East Avenue, Room 123, Norwalk, CT 06851-5125
Get directions (opens in a new tab) - Serves
- Norwalk · Fairfield County
- Online services
- Inspections
Check your address first. City of Norwalk Building and Code Enforcement handles building permits for property inside Norwalk city limits. Property outside city limits is usually served by Fairfield County or another municipality, even when the mailing address says Norwalk.
On this page
Norwalk’s Building & Code Enforcement Department reviews plans and issues building and trade permits throughout the City of Norwalk, including Rowayton, which the state’s building-official list refers to Norwalk. It also runs inspections, issues Certificates of Occupancy, handles building-code complaints, and oversees demolition, swimming pools, signs, and tents. The chief building official also chairs the city’s Condemnation Committee.
The office is in City Hall, 125 East Avenue, Room 123, open Monday–Friday, 8:30 a.m.–4:00 p.m. Inspectors are out in the field from 10:30 a.m. to 3:30 p.m. and can’t be reached then. The department asks you to allow 24 business hours for an emailed or phoned reply.
How a building permit works in Norwalk
Building permit applications aren’t available to the public. Building permits are issued by appointment, and an inspector fills out the application with you. To book, call (203) 854-7755 and press 1 or 2. The sequence:
- Zoning first. Get an approved Zoning Permit from Planning & Zoning (Room 129, (203) 854-7780). Zoning circulates it internally for Conservation/Wetlands review and calls you when the approvals are ready. Zoning wants at least three paper copies of a scaled site plan and dimensioned plans (four for commercial projects), dropped off or mailed. Zoning fees are paid by credit or debit card only, and after-the-fact zoning permits cost double. Some projects need a Zoning Permit even when they’re exempt from a building permit, such as a small shed.
- Collect the other sign-offs on the city’s procedure sheet as they apply. Each is listed below.
- Bring to the appointment: the construction cost (including trade prices), the contractor’s license and workers’ compensation or insurance certificate, and two department-stamped sets of drawings. Of the two stamped sets, one is for the file and one is the job copy. Residential projects need three sets of plans in total, and commercial projects need four.
| Sign-off | When required | Contact |
|---|---|---|
| Conservation | Listed on both residential and commercial procedure sheets | Room 129, (203) 854-7744 |
| Public Works | Driveway changes, new homes, first-floor expansions, sewer | Room 225, (203) 854-7791 |
| Health Department | Any home on septic or well; restaurants, food service, and salons | (203) 854-7995 |
| WPCA | New homes | (203) 854-3228 |
| Fire Marshal | Commercial and 3+ unit residential | 121 Connecticut Ave, (203) 854-0200 |
| Tax Assessor / Collector | Parcel verification and proof that taxes are paid | Rooms 106 / 105 |
| Redevelopment | Redevelopment areas only | 50 Washington St, (203) 854-7810 |
For commercial space, a tenant fit-up permit is required to occupy any commercial space, even if no work was done. You also need a copy of the tenant’s lease. Restaurants must also have their fats, oils, and grease plans reviewed by WPCA.
Roofing, windows, and siding
These permits generally don’t need zoning approval. Download the Roofing/Windows/Siding application and email it to inspector Peter Kelly ([email protected]).
Trade permits
You can submit electrical, plumbing, and mechanical permits digitally. Download the form from the Trade Permits page, fill it in, and email it to the trade inspector. Any exterior equipment needs a Zoning Permit approval first, including rooftop units, above-ground LP tanks, exterior oil tanks, and new or replacement AC condensers. Trade work that needs other departmental sign-offs follows the full building-permit procedure. Trade inspectors take calls and applications Monday–Friday, 8:30–10:30 a.m.
| Trade | Inspector | Phone |
|---|---|---|
| Mechanical & plumbing | Paul Zeiss | (203) 854-7966 |
| Electrical | Sal Cenatiempo | (203) 854-7968 |
| Building inspections | Leo Guerrero / Peter Kelly | (203) 854-7761 / (203) 854-7965 |
Fees
From the city’s current permit procedure sheets:
| Permit | Rate | Plus | Minimum |
|---|---|---|---|
| Residential (1–2 family) additions, alterations, new construction | $18 per $1,000 of cost | $0.26 per $1,000 state fee + $25 CO fee | $100 |
| Commercial, tenant fit-up, 3+ family, condo complexes | $20 per $1,000 | $0.26 per $1,000 + $50 CO fee | $150 |
Condo projects need a letter from the condo association. The department accepts all major credit cards or checks payable to the City of Norwalk.
Fences, walls, and decks
Norwalk’s fence and wall handout sets these rules:
- No building permit for fences up to 7 feet or retaining walls up to 3 feet. Zoning height and location rules still apply and vary by zone.
- A building permit with sealed drawings is required for fences over 7 feet or masonry walls over 4 feet.
- Fences must sit entirely on the owner’s side of the line. A current Class A-2 survey is the accepted reference.
- On corner lots, nothing within 30 feet of the corner may exceed 30 inches.
- No electrified, barbed-wire, or razor-ribbon fencing is allowed on residential property.
Deck permits require the city’s Deck Worksheet with your plan. It covers deck height, pier depth and spacing, girder and joist sizing and spans, ledger flashing, guardrail and picket sizes, and stair dimensions.
Records and rentals
- Permit history and CO research: email the Research Request form to the department ([email protected]) to get a Certificate of Occupancy/Compliance or to confirm a property has no open permits. You’ll be told the copy cost, and documents are scanned and sent after payment.
- Certificates of Apartment Occupancy: buildings with three or more units need a CAO from the Health Department after each vacancy (City Code Section 30A-1). Owner-occupied buildings with fewer than three units are exempt. Tenement house owners register every year by December 1. Housing code questions and complaints go to (203) 854-7821.
Codes
Norwalk enforces the 2022 Connecticut State Building Code (2021 International Codes), which applies to permit applications filed on or after October 1, 2022. The city’s zoning regulations were rewritten effective February 19, 2024.
Planning a project?
These guides explain the national model-code rules most departments start from. City of Norwalk Building and Code Enforcement decides what applies in Norwalk, so use them to prepare your questions.
Nearby building departments
Not the right office? If your property is outside Norwalk city limits, one of these may handle it.
Sources
- norwalkct.gov — Building Code Enforcement
- norwalkct.gov — Building Permit Procedure List
- norwalkct.gov — Apply for a Zoning Permit
- norwalkct.gov — Housing Code Enforcement
- portal.ct.gov — Regulations
- norwalkct.gov — View
- norwalkct.gov — View
- norwalkct.gov — View
- norwalkct.gov — Document View
- norwalkct.gov — Trade Permits
- norwalkct.gov — Additional Requirements and Resources
- portal.ct.gov — Bolist
- portal.ct.gov — Connecticut state building code
