An independent guide to local permits & inspections

County building department · Arizona

Pima County building department

Permits, inspections, and official contacts for Pima County Development Services Department.

Verified Checked against 9 official sources

Contacts & online services

Office
201 N. Stone Avenue, 1st Floor, Tucson, AZ 85701
Get directions (opens in a new tab)
Serves
Pima County
Online services
Applications (Accela) · Permit search · Inspections

Check your address first. Pima County Development Services Department is a county-level office. County building departments usually serve unincorporated areas, while cities and towns inside Pima County may run their own departments or contract with the county.

On this page 10 sections

Pima County Development Services handles building permits, site development, addressing, planning, and zoning and building code compliance for unincorporated Pima County. Tucson, South Tucson, Marana, Oro Valley, and other incorporated towns issue their own permits. A Tucson mailing address doesn’t mean the city has jurisdiction, so check the county’s “What’s my Zoning / Jurisdiction?” map first.

The Building and Site Development lobby is on the first floor of the Public Works Building, 201 N. Stone Ave., open 8 a.m. to 4 p.m. on weekdays. The City of Tucson’s development center is in the same building, but it is a separate office.

Exemptions and permit triggers

A building permit is needed for new buildings, remodels, and placing or moving a manufactured building, unless the work is exempt. Exempt work can still need county approval under the Native Plant Preservation Ordinance or a Buffer Overlay Zone, or if the site is in a floodplain. The Regional Flood Control District answers floodplain questions at (520) 724-4600.

Work Permit?
Deck more than 30 in. above grade Yes
Deck or flatwork 30 in. or less above grade, not over a story below, not on an accessible route No
Non-retaining walls and fences up to 7 ft No
Re-roof with like materials No
Structural roof work Yes
Window or door replacement No
New siding, skylights, porch enclosures Yes
Drywall No, unless shear or fire walls are affected
Paint, tile, carpet, cabinets, counters (no plumbing or electrical) No
Driveway (not in a Hillside Development Zone or the right-of-way) No
Window awnings projecting 54 in. or less, wall-supported No
Fireplace or wood stove Yes
Water heater, new or replacement Yes
Dishwasher, water softener Yes
Water tank on grade up to 5,000 gal (height-to-diameter ratio 2:1 or less) No
Central A/C or furnace, mini-split, ductwork changes Yes
Like-for-like evaporative cooler swap No
New outlets or fixtures Yes
Like-for-like outlet or fixture replacement No
Solar PV or generator Yes
Pool, including above-ground pools over 18 in. deep or 5,000 gal Yes
Agricultural buildings Yes
Playground equipment at a one- or two-family home No

Grading permits

You need a grading permit for:

  • A single home with 14,000 sq ft or more of graded area
  • Grading on slopes of 15% or more
  • Cut or fill slopes over 5 ft high and steeper than 3:1
  • More than 3,000 sq ft of new paving

You don’t need one for clearing less than 14,000 sq ft on a non-hillside lot, or for less than 3,000 sq ft of new paving.

Applying

Building permits and site development plans must be submitted electronically. Permit Gateway (permits.pima.gov) asks a series of questions to point you to the right permit, and it also handles parcel research, fee payment, and address changes. Applications, fees, permit status, and inspection results run on the county’s Accela Citizen Access site. Septic submittals are no longer accepted by email to Building Safety Admin.

Since January 1, 2026, the county has reviewed applications for accessory dwelling units (ADUs). The ADU guidelines memo is on the Building Permits Resources page. The county also publishes a guide to its rules for off-grid living in unincorporated areas.

Fees

Building permit costs include three parts:

  • Building fees
  • Sewer connection fees
  • Transportation impact fees

The county posts its Review and Processing Fees schedule (PDF) plus downloadable fee calculators for residential and commercial projects. A separate spreadsheet covers site development fees. Right-of-way use permits have their own fee schedule.

Adopted codes

Since January 1, 2019, the county has enforced the 2018 International Codes and the 2017 National Electrical Code. The county posted draft local amendments to the 2024 IECC and said that, pending approval, it would start enforcing them on July 1, 2026.

Inspections

The county’s inspections run on Vuspex. You can book field or remote inspections online or in the Vuspex Go app.

  • Field inspections: Book before 4 p.m. for the next business day. Post the site address clearly. You can add gate codes or directions when you book.
  • Remote inspections: Available any time during normal inspection hours. Site-off-model permits qualify if the county has an electronic copy of the model plan. The remote inspector may partially approve and send someone to the site.
  • Outlying areas: On-site inspections happen one day a week: Ajo, Why, and Lukeville on Tuesdays; Arivaca and Sasabe on Wednesdays; Mt. Lemmon on Thursdays. Remote inspections aren’t limited this way.
  • Custom or same-day inspections: For weekends, a set time, or same-day service, call (520) 419-2355 or (520) 235-4600. Extra charges may apply.
  • Rooftop solar: Residential rooftop solar uses Vuspex Offline Field Reports, which the county aims to review within 24 hours.
  • Trusses: Deferred truss calculations must be approved before the roof and wall bracing inspection (0130) can be scheduled.

The Inspector Tracking site shows an estimated arrival window. For a single-family home, final inspection approval is the certificate of occupancy, and no separate certificate is issued. Other permit types list their own pre-final (P2F) and pre-certificate (P2C) conditions.

Records

Online tools cover:

  • Permit, project, and inspection history through Accela
  • Septic records from 2007 on
  • Sewer connection records, including historical connection cards
  • Approved development drawings
  • Custom data reports

Building records you can’t find online can be requested through the Residential/Commercial Building Records request.

Planning a project?

These guides explain the national model-code rules most departments start from. Pima County Development Services Department decides what applies in Pima County, so use them to prepare your questions.

Nearby building departments

Not the right office? If your property is outside Pima County, one of these may handle it.

All Arizona building departments

Sources

We checked these official pages on October 21, 2026. Fees, forms, and office hours change, so confirm details with the department before you apply.

  1. pima.gov — Development Services
  2. pima.gov — Building Site Development
  3. pima.gov — Do I Need a Permit
  4. pima.gov — How Do I Get a Permit
  5. pima.gov — Building inspection portal
  6. pima.gov — Development Services Fees
  7. publicworks.pima.gov — DSDPublic Tools
  8. permits.pima.gov
  9. aca-prod.accela.com — Default

Report an outdated detail · How we research guides