Local building department guide · Updated 2026-07-30
Bismarck Building Department | Permits, Inspections & Contact
Use this guide to find the official City of Bismarck Building Inspections Department, start a permit application, search permit records, schedule an inspection, and locate the correct zoning or plan review contact.
Start here
Quick actions
Apply for a building permit
Review the typical application path and prepare your project details.
See permit stepsTrack or search permits
Find Bismarck permit search resources and application status links.
Search permitsSchedule a building inspection
Learn what to have ready before requesting your next inspection.
Schedule inspectionOther portal login
Open the department's official online services and permit portal.
Open portalThe City of Bismarck Building Inspections Department handles permitting, plan review, building-code and zoning enforcement, floodplain management, inspections, and occupancy certificates within Bismarck and the City’s extra-territorial area. Burleigh County does not replace the City as the permitting authority for a Bismarck address.
How to apply for a Bismarck building permit
Review the City’s permit applications and “permits are required” guidance before applying. Bismarck identifies new construction, additions, renovations, change of occupancy, accessory structures, demolition, and many electrical, plumbing, and mechanical projects as permit-related work. Registered public users and contractors can submit eligible applications and documents through the City’s eTRAKiT portal.
The application should identify the property, project scope, valuation, responsible contractor, and plans or supporting documents required for the permit type. Site-plan, floodplain, utility, fire, or zoning review may be needed in addition to building-code review. Construction must not begin before the required permit is issued.
Bismarck inspections and certificate of occupancy
The permit holder is responsible for notifying Building Inspections when each phase is ready. The City says eTRAKiT inspection requests generally must be submitted one day before the requested date, and the permit must have an ISSUED status. Final inspections must occur after permitted work is complete and before occupancy. A certificate of occupancy verifies that the work complies with the approved permit; Bismarck’s business-development guidance states that occupancy is not legally authorized without the required final or temporary certificate.
Bismarck zoning and plan review
Use the City’s zoning verification process when a lender, agency, owner, or project team needs formal confirmation of a parcel’s zoning classification or related information. A zoning verification request requires the parcel ID and may address nonconforming status, certificates of occupancy, and code violations. Larger commercial, industrial, and multifamily projects may require site-plan review before the building permit is issued.
Official Bismarck contact information
The City lists Building Inspections at 221 N. 5th Street, Bismarck, North Dakota 58501, phone 701-355-1465. Use eTRAKiT to apply, search permit records, and schedule eligible inspections; contact the department when a project crosses the City’s extra-territorial boundary or needs a zoning, floodplain, or occupancy determination.
Permit process
How to Apply for a Bismarck Building Permit
Confirm the project scope
Identify the work, property address, project valuation, and whether plans are required.
Prepare your documents
Gather plans, owner and contractor details, site information, and any zoning approvals.
Submit and monitor
Submit through the department’s stated process, pay fees, and watch for review comments.
Field work & closeout
Building Inspections & Code Compliance in Bismarck
Most permitted work must remain accessible for inspection at defined stages. Before scheduling, check your permit record for the required inspection sequence and make sure the site is safe and ready. Final inspections can be especially important for code compliance and a certificate of occupancy.
Helpful preparation
Keep the permit card or approval number available, confirm the property address, and ask the official office about lead times or reinspection fees.
Planning & review
Zoning and Plan Review Requirements
A building permit is not always the only approval your project needs. Zoning guidelines may affect use, setbacks, height, parking, signage, or lot coverage. Residential and commercial building permits can also follow different plan review tracks, so confirm the correct path before investing in a full plan set.
For a project in Bismarck, start with the official department below and ask which zoning, planning, conservation, or fire review approvals apply to your address.
Keep this handy
Official Contact Information
| Department | City of Bismarck Building Inspections Department |
|---|---|
| Phone | 701-355-1465 |
| Address | 221 N. 5th Street, Bismarck, ND 58501 |
| Official website | https://www.bismarcknd.gov/111/Building-Inspections |
| Last verified | 2026-07-30 |
Official source pages used for this guide
These links were checked on 2026-07-30. Requirements, fees, office hours, and portal addresses can change; use the official source as the final authority.
- https://www.bismarcknd.gov/111/Building-Inspections
- https://www.bismarcknd.gov/122/Permit-Applications-and-Forms
- https://www.bismarcknd.gov/124/Permits-Are-Required-For
- https://www.bismarcknd.gov/125/Required-Inspections
- https://www.bismarcknd.gov/2362/Zoning-Verification
- https://trakitapi.bismarcknd.gov/etrakit/